精品国产一区二区三区忘忧草_欧美日韩黄色一区二区_亚洲成在人线免费_亚洲精品永久免费

ABB避雷器放電記錄儀 原裝 DJS-II/C代理
  • ABB避雷器放電記錄儀 原裝 DJS-II/C代理
  • ABB避雷器放電記錄儀 原裝 DJS-II/C代理
  • ABB避雷器放電記錄儀 原裝 DJS-II/C代理

產品描述

電壓35kv 電流100A 質保一年 認證CCC 材質防觸電
When the lightning arrester flows through lightning wave, operation wave or power frequency overvoltage, the strong action current will be transferred from the leakage current measurement circuit to the counter circuit, and the leakage current measurement circuit is protected. The counter part uses the principle of electromagnetic induction to obtain the signal of operation wave or power frequency overvoltage current, and then processed by the microprocessor in the display to record the number of actions
Long press the "F" key, then "CLR" will prompt whether all counts are cleared, and "-" will be displayed. After a "-" appears  Execute the reset operation, and release the "F" key to exit before a "-" appears; 5. After pressing "▲" and "▼" at the same time to enter the setting state, the "year" bit flashes first, which can be adjusted by up and down keys; adopt Short touch "F" to switch to "month", "day", "hour", "minute" and "second" in sequence. When the second adjustment is over, short touch "F" to display the address code of the counter. If adjustment is needed, press "▲" and "▼" to adjust, and the adjustment will take effect immediately; During the adjustment, if the operation stops at any position for more than 7S, the standby state will be restored automatically, and the previous adjustment is effective. 6. Relevant data can be managed by background software through 485 bus;
DJS-II/C代理
Method of use1. Connect the corresponding wiring according to the operation manual; 2. When powered on, the LCD is displayed in turn according to the sequence of phase a counting, phase B counting and phase C counting;  3. Short touch the "F" key to check phase a count, phase B count, phase C count, local address, current date and current address in turn Time, when the current time is displayed, if it is djs-ii type, press the "F" key three times to zero the leakage current value (please pull out the data cable during zero calibration).
DJS-II/C代理
Data can be downloaded and analyzed with special software through mobile computer and 485-232 transfer interface. Overall dimension, installation method and wiring diagram  Overall dimension
DJS-II/C代理
Scope of application: 3 ~ 35kV system discrete lightning arrester without (with Series) gap; 2. Power supply: AC / DC 110 ~ 220V, < 1.5W;3. Counting form: A, B and C phases are counted separately and displayed on centralized LCD; 4. Minimum capture discharge current: < 10A; 5. Minimum capture pulse width: < 1 μ s; 6. Leakage current monitoring range: 0 ~ 20mA; 7. Built in clock, power failure holding time: half a year; 8. Storage capacity: > 2000 pieces;  9. Communication interface: 485, class Modbus protocol; 10. Independent address code can be set
長按“F”鍵,“CLR”將提示是否清除所有計數,并顯示“-”。在出現“-”之后執行復位操作,在出現“-”之前釋放“F”鍵退出;5.按后“▲" 及"▼同時進入設定狀態時,“年”位先閃爍,可通過上下鍵進行調整;采短“F”可依次切換到“月”、“日”、“小時”、“分鐘”和“秒”。第二次調整結束后,短按“F”可顯示計數器的地址代碼。如果需要調整,請按“▲“和”▼“調整,調整立即生效;調整過程中,如果操作在任何位置停止超過7S,則自動恢復待機狀態,前一次調整生效。6.相關數據可通過485總線由后臺軟件管理;

http://m.syyf1029.com

產品推薦

您是第8773042位訪客

版權所有 ©2026-08-30 滬ICP備2024066546號-1 上海博沃斯自動化科技有限公司 保留所有權利.

技術支持: 八方資源網 免責聲明 管理員入口 網站地圖


主站蜘蛛池模板: 久久久久国色av免费观看性色| 蜜桃麻豆91| 久久夜色精品国产亚洲aⅴ| 日韩欧美在线播放视频| 国产在线精品一区二区三区| 国产综合av一区二区三区 | 国产在线播放一区二区| 国产精品美女视频网站| 精品不卡在线| 欧美中文字幕视频在线观看| 国产日韩欧美日韩| 两个人的视频www国产精品| 欧日韩不卡在线视频| 日韩在线观看精品| 大波视频国产精品久久| 久久精品人人做人人爽电影 | 国产精品视频播放| 久久久久久69| 国产伦精品免费视频| 日韩色av导航| 欧美一区少妇| 国产福利久久| 日韩欧美亚洲天堂| 久久久久久久av| 日韩一区视频在线| 欧美一级电影久久| 精品91免费| 91精品在线观| 国产狼人综合免费视频| 97成人在线观看视频| 日韩成人在线资源| 中文字幕精品在线播放| 日本精品国语自产拍在线观看| 久久精品ww人人做人人爽| 91精品国产综合久久香蕉最新版 | 日韩欧美视频网站| 电影午夜精品一区二区三区| 欧美日韩视频在线一区二区观看视频| 欧美中文在线观看国产| 日韩久久久久久久| 狠狠色狠狠色综合人人|