精品国产一区二区三区忘忧草_欧美日韩黄色一区二区_亚洲成在人线免费_亚洲精品永久免费

避雷器 質(zhì)保一年 DJS-II/C公司
  • 避雷器 質(zhì)保一年 DJS-II/C公司
  • 避雷器 質(zhì)保一年 DJS-II/C公司
  • 避雷器 質(zhì)保一年 DJS-II/C公司

產(chǎn)品描述

電壓35kv 電流100A 質(zhì)保一年 認證CCC 材質(zhì)防觸電
When the lightning arrester flows through lightning wave, operation wave or power frequency overvoltage, the strong action current will be transferred from the leakage current measurement circuit to the counter circuit, and the leakage current measurement circuit is protected. The counter part uses the principle of electromagnetic induction to obtain the signal of operation wave or power frequency overvoltage current, and then processed by the microprocessor in the display to record the number of actions
Scope of application: 3 ~ 35kV system discrete lightning arrester without (with Series) gap; 2. Power supply: AC / DC 110 ~ 220V, < 1.5W;3. Counting form: A, B and C phases are counted separately and displayed on centralized LCD; 4. Minimum capture discharge current: < 10A; 5. Minimum capture pulse width: < 1 μ s; 6. Leakage current monitoring range: 0 ~ 20mA; 7. Built in clock, power failure holding time: half a year; 8. Storage capacity: > 2000 pieces;  9. Communication interface: 485, class Modbus protocol; 10. Independent address code can be set
DJS-II/C公司
Data can be downloaded and analyzed with special software through mobile computer and 485-232 transfer interface. Overall dimension, installation method and wiring diagram  Overall dimension
DJS-II/C公司
Long press the "F" key, then "CLR" will prompt whether all counts are cleared, and "-" will be displayed. After a "-" appears  Execute the reset operation, and release the "F" key to exit before a "-" appears; 5. After pressing "▲" and "▼" at the same time to enter the setting state, the "year" bit flashes first, which can be adjusted by up and down keys; adopt Short touch "F" to switch to "month", "day", "hour", "minute" and "second" in sequence. When the second adjustment is over, short touch "F" to display the address code of the counter. If adjustment is needed, press "▲" and "▼" to adjust, and the adjustment will take effect immediately; During the adjustment, if the operation stops at any position for more than 7S, the standby state will be restored automatically, and the previous adjustment is effective. 6. Relevant data can be managed by background software through 485 bus;
DJS-II/C公司
Method of use1. Connect the corresponding wiring according to the operation manual; 2. When powered on, the LCD is displayed in turn according to the sequence of phase a counting, phase B counting and phase C counting;  3. Short touch the "F" key to check phase a count, phase B count, phase C count, local address, current date and current address in turn Time, when the current time is displayed, if it is djs-ii type, press the "F" key three times to zero the leakage current value (please pull out the data cable during zero calibration).
長按“F”鍵,“CLR”將提示是否清除所有計數(shù),并顯示“-”。在出現(xiàn)“-”之后執(zhí)行復位操作,在出現(xiàn)“-”之前釋放“F”鍵退出;5.按后“▲" 及"▼同時進入設定狀態(tài)時,“年”位先閃爍,可通過上下鍵進行調(diào)整;采短“F”可依次切換到“月”、“日”、“小時”、“分鐘”和“秒”。第二次調(diào)整結束后,短按“F”可顯示計數(shù)器的地址代碼。如果需要調(diào)整,請按“▲“和”▼“調(diào)整,調(diào)整立即生效;調(diào)整過程中,如果操作在任何位置停止超過7S,則自動恢復待機狀態(tài),前一次調(diào)整生效。6.相關數(shù)據(jù)可通過485總線由后臺軟件管理;

http://m.syyf1029.com

產(chǎn)品推薦

您是第8803738位訪客

版權所有 ©2026-09-01 滬ICP備2024066546號-1 上海博沃斯自動化科技有限公司 保留所有權利.

技術支持: 八方資源網(wǎng) 免責聲明 管理員入口 網(wǎng)站地圖


主站蜘蛛池模板: 91精品国产91久久久久久吃药| 美日韩精品免费视频| 好吊色欧美一区二区三区| 青青草精品视频在线| 国产美女在线精品免费观看| 91精品国产91| 午夜精品一区二区三区视频免费看 | 欧美日韩精品免费看| 国产成人精品av在线| 韩国视频理论视频久久| 欧美午夜精品久久久久久蜜欧美亚洲第一页 | 综合操久久久| 国产在线精品一区二区三区| 日韩av免费一区| 99久久国产综合精品五月天喷水| 久久视频中文字幕| 青青草精品视频在线| 日本精品一区二区三区不卡无字幕| 91免费视频国产| 国产精品一香蕉国产线看观看| 久久久久国产一区二区三区| 日本高清久久天堂| 日韩在线高清视频| 亚洲精品在线视频观看| 一区二区欧美日韩| 亚洲自拍欧美另类| 一区二区三区四区久久| 亚州国产精品久久久| 亚洲v日韩v欧美v综合| 国产精品九九九| 国产日韩欧美另类| 精品免费国产| 国产一区亚洲二区三区| 激情五月婷婷六月| 久久99精品久久久久久水蜜桃| 久久免费精品视频| 久久久久久久久久久视频| 欧美日韩精品不卡| 久久躁狠狠躁夜夜爽| 麻豆精品视频| 久久久久久久国产精品视频|